Storm Water Infiltration Testing for New Development & Redevelopment Projects

October 10, 2017

  

New post-construction requirements in San Diego County requires new developments and redevelopments to start incorporating an integrated storm water and runoff management system. These systems are to reduce storm water runoff volume into an onsite basin or bio-filtration system. The standards are described in the Regional Best Management Practices (BMP) Design Manual. 

 

Click here to go to San Diego Counties BMP for Stormwater Management

 

Here at MBCE we have performed infiltration testing, rate assessments and determining factor of safety for areas to manage storm water. Testing and assessments are done after assessing the feasibility criteria for the property to determine if storm water management requirements are applicable to the project.  We have submitted infiltration rate assessment reports per the San Diego County requirements.

 

Click here to go to San Diego Counties BMP regarding Infiltration Testing

 

If you have any questions regarding these procedures please feel free to call or contact us!

 

Click here to go to our contact page

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

June 25, 2020

Please reload

Archive
Please reload

Search By Tags

Contact us -

Phone Number: (760) 407-4000 

Email: marc@boogay.com

© Copyright 2013 Marc Boogay Consulting Engineer